A Right-of-Way permit is needed anytime a private citizen or contractor performs work within the road right-of-way (typically 33 feet on each side from center of road) including driveways (new installation or resurfacing), tree trimming or utility work.
What is the maximum slope for a driveway in Michigan?
Generally the minimum pavement slopes shall be one (1) percent. Lesser slopes may be used if existing topography prohibits a one (1) percent slope and only upon approval by the engineer. 2. Maximum driveway slopes shall be eight (8) percent.
All decks, porches, and patios must be built in accordance with the Michigan Residential Code. All decks porches and patios require a building permit. Guardrails are required on structures 30 inches above the floor or grade below and shall not be less than 36 inches in height.
What happens if you don't pull a permit in Michigan?
Michigan builders who do not acquire permits for their projects face hefty penalties and jail time. Homeowners also face several consequences when a builder performs unpermitted work at their home which can include: Possibility of being left with a poorly constructed space.
Do you need a permit to pour concrete driveway in Michigan?
All work shall be performed according to the current Michigan Building Code for commercial and Michigan Residential Code. Homeowners are allowed to obtain permits for projects on private property only (driveways, service walks, porch cap replacements, garage floor replacements).
What size deck can I build without a permit in Michigan?
For a freestanding deck not adjacent to a house, a building permit is required for a deck 200 sq. ft. or larger with supporting beams, joists or posts. Deck construction shall meet the requirements of the current Michigan State Residential Code, which is derived from the International Residential Code.
The concrete truck should begin pouring into the bottom part of the slope and then work upward. If the pour has different footing depths, focus on pouring the deepest footings first to help prevent the concrete from running downhill.
Brick and concrete pavers are not ideal here, though, since they are not as durable and do not handle ice or snow very well. Permeable plastic pavers like the kind made by TRUEGRID are the superior option for creating the best driveway for a slope.
Do you need a permit to replace windows in Michigan?
In general, exterior work, fence, siding, windows, roofing, and concrete require a permit. Any interior work that requires a structural change will require a permit. Interior cosmetic work does not require a permit (i.e. painting, replacing tile, carpeting). 2.
Michigan state law allows homeowners to obtain permits to work on their own homes. It is against the law for contractors to perform work under permits obtained by homeowners. The contractor you hire to complete a home construction project should be the person who obtains the permit from the city.
Do I need a permit to remodel my kitchen in Michigan?
The general rule of thumb is that if you're only making cosmetic changes, your kitchen remodel probably doesn't require a permit. But if you're planning a more involved project with electrical, plumbing, and/or structural changes, your kitchen remodel most likely will require a permit.
What happens if you build a deck without a permit in Michigan?
If an unpermitted deck is discovered by building authorities, they will order an inspection on it, assess a fee for an unpermitted deck, and/or even order you to take it down completely, especially if the deck is not built to building code specifications or is unsafe as a result.
Whether or not you need planning permission for a driveway will depend on your individual situation. In general, if the driveway is to be part of a new build project, then the details of it should form the 'access' part of the planning application for the new dwelling.
When Will You Need Planning Permission for Your Driveway? In simple terms, you won't need planning permission if you intend your new driveway (regardless of its size) to use permeable or porous surfacing that allows liquid (such as rainwater) to drain through.
How long does it take to get a building permit in Michigan?
Residential. Under normal conditions, every attempt will be made to issue residential permits within 3 business days after the Building Department has received and approved a properly filled out application and any accompanying required documentation.
How long is the permit good for? Work must start on a project within 6 months of the permit being issued and the permit remains valid for as long as work is progressing. If the work stops for 6 months or more, the permit becomes invalid. Extensions may be granted if requested in writing before the permit expires.
The Michigan Licensing Law gives a homeowner an exemption to act as his or her own general contractor. This means in the case of his or her own single-family residence, that they will occupy, the homeowner may obtain a building permit for construction at his or her own home.